You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

Palermo - Catania - Messina HC Railway line, Lercara - Caltanisetta Xirbi Section, Italy

AC PA ME CT TRATTA LERCARA CALTANISSETTA XIRBI 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

PALERMO - CATANIA - MESSINA HC RAILWAY LINE, LERCARA - CALTANISSETTA XIRBI SECTION, ITALY

60 minutes. On some occasions this can be considered very little, while on others it can be a problem. In the case of rail transport, in fact, these 60 minutes can be decisive for citizens in the choice of using a sustainable means of transport such as the train or opting for a more polluting but faster one.

It is with this mobility objective in mind that the entire project for the construction of the Palermo-Catania-Messina route, which also includes the section Lercara-Caltanissetta Xirbi, was conceived.

Commissioned by RFI - Rete Ferroviaria Italiana (Gruppo FS Italiane), section Lercara-Caltanissetta Xirbi envisages the design and construction of 47 km of new railway line, with a route that will mostly deviate from the historical line.

The work will be carried out using state-of-the-art techniques and machinery: 22 km of tunnels (including interconnections) will be excavated with TBM (Tunnel Boring Machines), more than 11 km of viaducts will also be built, 32 km of connected roads and the Vallelunga station will be modernised.

The project is part of the wider programme to strengthen the Palermo-Catania-Messina railway line, of which Lot 3 is an integral part, and is a strategic infrastructure for Sicily and Italy. It also benefits from PNRR funding, and is intended to increase the speed and efficiency of goods and passenger transport on the island by significantly reducing travel time between Catania and Palermo.

AC PA ME CT TRATTA LERCARA CALTANISSETTA XIRBI GALLERY 01
AC PA ME CT TRATTA LERCARA CALTANISSETTA XIRBI GALLERY 02
AC PA ME CT TRATTA LERCARA CALTANISSETTA XIRBI GALLERY 03
AC PA ME CT TRATTA LERCARA CALTANISSETTA XIRBI GALLERY 04
AC PA ME CT TRATTA LERCARA CALTANISSETTA XIRBI GALLERY 05
 BACKGROUND 3

THE WORK AND THE TECHNIQUE

Construction period: 2023 - on going
47

KM SECTION LENGTH

 

22

KM TUNNEL

11

KM VIADUCTS

CLIENT

RFI - Rete Ferroviaria Italiana (Gruppo FS Italiane)

 

 

CONTRACTOR

Webuild Group leader in consortium (60%) with Ghella (20%) and Impresa Pizzarotti (20%)

Discover other works

HERO LINEA FERROVIARIA TRANSCAMERUNENSE ZOOM
THE TRANS-CAMEROON RAILWAY, CAMEROON
HERO LINEA FERROVIARIA DEL SEMPIONE ZOOM
THE SIMPLON RAILWAY LINE, ITALY AND SWITZERLAND
HERO Brennero ZOOM
BRENNER BASE TUNNEL, AUSTRIA AND ITALY
HERO RomaFirenze ZOOM
"DIRETTISSIMA" ROME-FLORENCE HIGH-SPEED RAILWAY LINE, ITALY
HERO AVAC MITO ZOOM
TURIN-MILAN HIGH-SPEED / HIGH-CAPACITY RAILWAY, ITALY
NA Afragola 3840x1600
NAPLES AFRAGOLA HIGH-SPEED RAILWAY STATION, ITALY
HERO TRANSIRANIANA ZOOM
TRANS-IRANIAN RAILWAY, IRAN
HERO AVAC BOFI ZOOM
BOLOGNA-FLORENCE HIGH-SPEED / HIGH-CAPACITY RAILWAY, ITALY
NA BA 3840x1600
NAPLES-BARI HIGH-SPEED / HIGH-CAPACITY RAILWAY LINE, ITALY