You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

Palermo - Catania - Messina HC Railway line, Bicocca - Catenanuova Section, italy

AC PA ME CT TRATTA BICOCCA CATENANUOVA 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

PALERMO - CATANIA - MESSINA HC RAILWAY LINE, BICOCCA - CATENANUOVA SECTION, ITALY

The ambitious project to double the length of the Bicocca-Catenanuova railway line is notable for its scale, covering 37.5 km and forming part of the great Palermo-Catania railway modernisation.

From the tracks to the signalling, from the stations to the electrical substations, every aspect is being revolutionised to guarantee a state-of-the-art transport system. In fact, in addition to the track, signalling, telecommunications and electrification works to supply power to the trains, the Bicocca station will be modernised and the Motta Sant'Anastasia station will be completely rebuilt.

The works will be carried out almost entirely above ground, with the construction of viaducts up to 500 metres long crossing the Simeto and Buttaceto rivers. These are complex and extensive works, with earth movements of 1.45 million cubic metres and many small crossings.

During all this time, the traditional railway line has continued to operate without interruption.

Several benefits are expected once the work is completed: over 2 and a half million passengers a year, and over 13,000 tons of CO2 avoided every year. The Bicocca-Catenanuova contract is part of a larger project relating to the European TEN-T corridor system, the aim of which is to improve the competitiveness of rail transport and to integrate the south-eastern railway network into the HS/HC system, thereby reducing CO2 emissions.

AC PA ME CT TRATTA BICOCCA CATENANUOVA GALLERY 01
AC PA ME CT TRATTA BICOCCA CATENANUOVA GALLERY 02
AC PA ME CT TRATTA BICOCCA CATENANUOVA GALLERY 03
AC PA ME CT TRATTA BICOCCA CATENANUOVA GALLERY 04
AC PA ME CT TRATTA BICOCCA CATENANUOVA GALLERY 05
GALLERY AC PA ME CT TRATTA BICOCCA CATENANUOVA 07
GALLERY AC PA ME CT TRATTA BICOCCA CATENANUOVA 08
GALLERY AC PA ME CT TRATTA BICOCCA CATENANUOVA 09
GALLERY AC PA ME CT TRATTA BICOCCA CATENANUOVA 10
 BACKGROUND 7

THE WORK AND THE TECHNIQUE

Construction period: 2018-on going
214,800

M3 CONCRETE

24,000

TONS STEEL

37

RAIL EMBANKMENTS

 

24

RAIL CUTTINGS

17

RAILWAY VIADUCTS

 

2

MAN-MADE TUNNELS

5

UNDERPASSES

15

OVERPASSES

CLIENT

RFI – Rete Ferroviaria Italiana (Gruppo FS Italiane)

 

CONTRACTOR

S. Agata FS S.C.r.l. (100% Webuild Group)

Discover other works

HERO LINEA FERROVIARIA TRANSCAMERUNENSE ZOOM
THE TRANS-CAMEROON RAILWAY, CAMEROON
HERO LINEA FERROVIARIA DEL SEMPIONE ZOOM
THE SIMPLON RAILWAY LINE, ITALY AND SWITZERLAND
HERO Brennero ZOOM
BRENNER BASE TUNNEL, AUSTRIA AND ITALY
HERO RomaFirenze ZOOM
"DIRETTISSIMA" ROME-FLORENCE HIGH-SPEED RAILWAY LINE, ITALY
HERO AVAC MITO ZOOM
TURIN-MILAN HIGH-SPEED / HIGH-CAPACITY RAILWAY, ITALY
NA Afragola 3840x1600
NAPLES AFRAGOLA HIGH-SPEED RAILWAY STATION, ITALY
HERO TRANSIRANIANA ZOOM
TRANS-IRANIAN RAILWAY, IRAN
HERO AVAC BOFI ZOOM
BOLOGNA-FLORENCE HIGH-SPEED / HIGH-CAPACITY RAILWAY, ITALY
NA BA 3840x1600
NAPLES-BARI HIGH-SPEED / HIGH-CAPACITY RAILWAY LINE, ITALY