Telt Interchange Niches of the Maddalena, Italy

TELT NICCHIE DI INTERSCAMBIO DELLA MADDALENA 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

TELT INTERCHANGE NICHES OF THE MADDALENA , ITALY

TELT Tunnel Euralpin Lyon Turin project is one of the most important links between Italy and Europe with the new Turin-Lyon railway line, part of the Trans-European Transport Network (TEN-T). This project will link rail networks, ports, airports and freight villages, improving the connection between the peninsula and European countries. It includes the Maddalena Tunnel at Chiomonte (Turin), the main Italian construction site on the Turin-Lyon line. Started as a geognostic tunnel, it provides crucial geological information for the excavation of the base tunnel on the Italian side.

Excavation of the base tunnel begins in Chiomonte and required the construction of 22 niches to adapt the tunnel to the passage of construction vehicles. These niches, 30 to 65 metres long and about 4.50 metres deep, ensure the safety of the construction vehicles.

Innovation is the key word in this project. To explore the last few kilometres of the tunnel and equip it with lighting, ventilation and other safety devices, Webuild, in collaboration with CIM (Competence Industry Manufacturing 4.0), created Axel. This is a robot, the first of its kind in Italy, that allows exploration activities to be carried out remotely, with the aim of reducing the risks for workers.

TELT NICCHIE DI INTERSCAMBIO DELLA MADDALENA GALLERY 01
TELT NICCHIE DI INTERSCAMBIO DELLA MADDALENA GALLERY 02
TELT NICCHIE DI INTERSCAMBIO DELLA MADDALENA GALLERY 03
TELT NICCHIE DI INTERSCAMBIO DELLA MADDALENA GALLERY 04
TELT NICCHIE DI INTERSCAMBIO DELLA MADDALENA GALLERY 05
 BACKGROUND 7

THE WORK AND THE TECHNIQUE

Construction period: 2020 - 2024
22

INTERCHANGE NICHES

30 TO 65 M LENGTH OF NICHES

4,50

M NICHE DEPTH

CLIENT

TELT Tunnel Euralpin Lyon Turin sas

CONTRACTOR

Webuild in consortium with CSC Costruzioni SA (Webuild Group)

Discover other works

Fortore 3840x1600
FORTORE TUNNEL, ITALY
TerzoValico 3840x1600
TERZO VALICO GENOA JUNCTION, ITALY
HERO Riachuelo ZOOM
RIACHUELO ENVIRONMENTAL RESTORATION SYSTEM, ARGENTINA
HERO LakeMead ZOOM
LAKE MEAD INTAKE HYDRAULIC TUNNEL, USA