You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

Railway Line HC Palermo - Catania - Messina, Fiumefreddo - Taormina/Letojanni Railway Section, Italy

AC PA ME CT TRATTA FIUMEFREDDOTAORMINALETOJANNI 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

RAILWAY LINE HC PALERMO - CATANIA - MESSINA, FIUMEFREDDO - TAORMINA/LETOJANNI RAILWAY SECTION, ITALY

The Fiumefreddo - Taormina/Letojanni railway section is synonymous with the possibility of travelling between the beautiful coastlines of eastern Sicily, but also with the possibility of travelling quickly through the rural areas immersed in the Sicilian countryside, and therefore with the support and development of the South.

The project includes about 13.9 km of new double-track railway line, including the construction of the Taormina - Letojanni junction, and is part of the Palermo - Catania - Messina railway axis, part of the Scandinavia-Mediterranean corridor of the Trans-European Transport Network (TEN-T), the European network for sustainable mobility.

It includes the Taormina underground station, an artificial tunnel at Fiumefreddo, two viaducts and two natural tunnels. The first, the Calatabiano tunnel, is a double track with a single tube and a length of 3.3 kilometres; the second, the Taormina tunnel, is a double tube and a length of 6.1 kilometres.

When completed, the works will reduce the journey time between Messina and Catania by approximately 30 minutes, allowing the development of a metropolitan service from Catania to Taormina, connecting rural villages that currently have no sustainable means of transport.

AC PA ME CT TRATTA FIUMEFREDDOTAORMINALETOJANNI GALLERY 01
AC PA ME CT TRATTA FIUMEFREDDOTAORMINALETOJANNI GALLERY 02
AC PA ME CT TRATTA FIUMEFREDDOTAORMINALETOJANNI GALLERY 03
AC PA ME CT TRATTA FIUMEFREDDOTAORMINALETOJANNI GALLERY 04
AC PA ME CT TRATTA FIUMEFREDDOTAORMINALETOJANNI GALLERY 05
 BACKGROUND 7

THE WORK AND THE TECHNIQUE

Construction period: 2023-in corso
15

KM RAILWAY LENGHT

200

KM/H SPEED

CLIENT

Rete Ferroviaria Italiana – RFI (Gruppo FS Italiane)

CONTRACTOR

Webuild Group, leader of the consortium with Pizzarotti

Discover other works

HERO LINEA FERROVIARIA TRANSCAMERUNENSE ZOOM
THE TRANS-CAMEROON RAILWAY, CAMEROON
HERO LINEA FERROVIARIA DEL SEMPIONE ZOOM
THE SIMPLON RAILWAY LINE, ITALY AND SWITZERLAND
HERO Brennero ZOOM
BRENNER BASE TUNNEL, AUSTRIA AND ITALY
HERO RomaFirenze ZOOM
"DIRETTISSIMA" ROME-FLORENCE HIGH-SPEED RAILWAY LINE, ITALY
HERO AVAC MITO ZOOM
TURIN-MILAN HIGH-SPEED / HIGH-CAPACITY RAILWAY, ITALY
NA Afragola 3840x1600
NAPLES AFRAGOLA HIGH-SPEED RAILWAY STATION, ITALY
HERO TRANSIRANIANA ZOOM
TRANS-IRANIAN RAILWAY, IRAN
HERO AVAC BOFI ZOOM
BOLOGNA-FLORENCE HIGH-SPEED / HIGH-CAPACITY RAILWAY, ITALY
NA BA 3840x1600
NAPLES-BARI HIGH-SPEED / HIGH-CAPACITY RAILWAY LINE, ITALY