You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

Palermo - Catania - Messina, Nuova Enna - Dittaino Section, Italy

AC PA CT ME TRATTA NUOVA ENNA DITTAINO 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

PALERMO - CATANIA - MESSINA HC RAILWAY LINE, NUOVA ENNA - DITTAINO SECTION, ITALY

The New Enna-Dittaino section is part of the High-capacity Palermo-Catania-Messina line, one of the most important Webuild projects for sustainable development and mobility in southern Italy.

It consists of 15 km of new high-capacity railway line, almost all of which will be built in tunnels and viaducts, with 3 tunnels covering 8.5 km of the line and 5 viaducts totalling 2 km. The works also include the construction of the New Enna station and the renovation of the Dittaino station.

The project adopts innovative solutions to minimise the environmental impact of the worksites on the area. One of the key strategies is the implementation of advanced circular economy processes. For example, approximately 99% of the aggregates produced during excavation will be reused, reducing the need for disposal and contributing to the conservation of natural resources.

The project also includes dedicated systems for the recovery and reuse of process water and rainwater, ensuring efficient use of water resources and contributing to environmental protection.

The work also includes solutions to improve energy efficiency and energy self-sufficiency through the installation of photovoltaic systems, thus promoting energy sustainability.

AC PA CT ME TRATTA NUOVA ENNA DITTAINO GALLERY 01
GALLERY AC PA CT ME TRATTA NUOVA ENNA DITTAINO 02
GALLERY AC PA CT ME TRATTA NUOVA ENNA DITTAINO 03
GALLERY AC PA CT ME TRATTA NUOVA ENNA DITTAINO 04
GALLERY AC PA CT ME TRATTA NUOVA ENNA DITTAINO 05
 BACKGROUND 7

THE WORK AND THE TECHNIQUE

Construction period: 2022-on going
15

KM IN LENGTH

3

TUNNELS

5

VIADUCTS

CLIENT

Rete Ferroviaria Italiana – RFI (Gruppo FS Italiane)

 

CONTRACTOR

Webuild (70%) leader of the consortium with Pizzarotti (30%)

Discover other works

HERO LINEA FERROVIARIA TRANSCAMERUNENSE ZOOM
THE TRANS-CAMEROON RAILWAY, CAMEROON
HERO LINEA FERROVIARIA DEL SEMPIONE ZOOM
THE SIMPLON RAILWAY LINE, ITALY AND SWITZERLAND
HERO Brennero ZOOM
BRENNER BASE TUNNEL, AUSTRIA AND ITALY
HERO RomaFirenze ZOOM
"DIRETTISSIMA" ROME-FLORENCE HIGH-SPEED RAILWAY LINE, ITALY
HERO AVAC MITO ZOOM
TURIN-MILAN HIGH-SPEED / HIGH-CAPACITY RAILWAY, ITALY
NA Afragola 3840x1600
NAPLES AFRAGOLA HIGH-SPEED RAILWAY STATION, ITALY
HERO TRANSIRANIANA ZOOM
TRANS-IRANIAN RAILWAY, IRAN
HERO AVAC BOFI ZOOM
BOLOGNA-FLORENCE HIGH-SPEED / HIGH-CAPACITY RAILWAY, ITALY
NA BA 3840x1600
NAPLES-BARI HIGH-SPEED / HIGH-CAPACITY RAILWAY LINE, ITALY