You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

Köseköy-Gebze Section of the High-speed Railway, Turkey

TRATTO FERROVIARIO ALTA VELOCITÀ KÖSEKÖY GEBZE 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

KÖSEKÖY-GEBZE SECTION OF THE HIGH-SPEED RAILWAY, TURKEY

In order to improve mobility and safety in the area, reduce traffic congestion and provide a modern and fast transport system in the area between Ankara and Istanbul, the reconstruction of the Köseköy-Gebze railway line was essential. The project to modernise the line, which is 56 km of double track and includes a number of significant interventions, was therefore implemented.

The first mandatory operation was the removal of the existing railway section, together with the power line and signalling system. This made it possible to realign the track to allow higher speeds of up to 165 km/h and to provide for the possibility of adding a third track in the future.

Part of the work was also devoted to the construction of new infrastructure, including works such as viaducts, subways, retaining walls and embankment protection. New ballast was built, new track was supplied and laid, and advanced electrification, signalling and telecommunications systems were designed and installed.

TRATTO FERROVIARIO ALTA VELOCITÀ KÖSEKÖY GEBZE GALLERY 01
TRATTO FERROVIARIO ALTA VELOCITÀ KÖSEKÖY GEBZE GALLERY 02
TRATTO FERROVIARIO ALTA VELOCITÀ KÖSEKÖY GEBZE GALLERY 03
TRATTO FERROVIARIO ALTA VELOCITÀ KÖSEKÖY GEBZE GALLERY 04
TRATTO FERROVIARIO ALTA VELOCITÀ KÖSEKÖY GEBZE GALLERY 05
 BACKGROUND 7

THE WORK AND THE TECHNIQUE

Construction period: 2011 - 2016
1,675,581

M3 EXCAVATION AND BALLAST REMOVAL

120,476

M3 EXCAVATION FOR FOUNDATIONS AND FILL

349,580

M3 FORMATION OF RAILWAY BASE

39,731

M3 TOTAL CONCRETE

36,000

M2 PROTECTING CLIFF

107,622

T PROTECTIVE REEFS

245,080

M3 SUPPLY AND LAYING OF BALLAST

111,400

M REMOVAL OF EXISTING TRACK

111,400

M LAYING OF NEW TRACK

CLIENT

Ministry of Transport, Maritime Affairs and Communications, DG for Foreign Relations and European Union Affairs - European Union Investment Department of the Republic of Turkey

Discover other works

HERO LINEA FERROVIARIA TRANSCAMERUNENSE ZOOM
THE TRANS-CAMEROON RAILWAY, CAMEROON
HERO LINEA FERROVIARIA DEL SEMPIONE ZOOM
THE SIMPLON RAILWAY LINE, ITALY AND SWITZERLAND
HERO Brennero ZOOM
BRENNER BASE TUNNEL, AUSTRIA AND ITALY
HERO RomaFirenze ZOOM
"DIRETTISSIMA" ROME-FLORENCE HIGH-SPEED RAILWAY LINE, ITALY
HERO AVAC MITO ZOOM
TURIN-MILAN HIGH-SPEED / HIGH-CAPACITY RAILWAY, ITALY
NA Afragola 3840x1600
NAPLES AFRAGOLA HIGH-SPEED RAILWAY STATION, ITALY
HERO TRANSIRANIANA ZOOM
TRANS-IRANIAN RAILWAY, IRAN
HERO AVAC BOFI ZOOM
BOLOGNA-FLORENCE HIGH-SPEED / HIGH-CAPACITY RAILWAY, ITALY
NA BA 3840x1600
NAPLES-BARI HIGH-SPEED / HIGH-CAPACITY RAILWAY LINE, ITALY