FRONTIERĂ-CURTICI-SIMERIA RAILWAY (LOTS 2A, 2B AND 3), ROMANIA

The project to rehabilitate the Frontieră-Curtici-Simeria border railway line, part of Pan-European Corridor IV through Romania, is an important step towards developing and promoting sustainable mobility. It will promote the movement of people and goods on an environmentally friendly mode of transport such as rail, thus reducing the environmental impact compared to traditional road transport.

Lots 2A and 2B provide for the rehabilitation of approximately 80 kilometres of this important railway artery. Eleven stations, 30 bridges and one tunnel will be built, providing a modern and efficient infrastructure that promotes the use of rail as the preferred mode of transport. In addition, the ERTMS signalling and telecommunications system will ensure the safety and efficiency of services along the entire line.

Lot 3 aims to rehabilitate an additional 40 km of the 614 km Radna-Simeria section between Gurasada and Simeria. This will include the construction of some 20 bridges to facilitate transit, the electrification of the line and the installation of the ERTMS signalling system. In addition to renovating existing stations, minor works will be carried out to improve the overall experience for passengers and freight operators.

GALLERY LINEA FERROVIARIA FRONTIERĂ CURTICI SIMERIA 01
GALLERY LINEA FERROVIARIA FRONTIERĂ CURTICI SIMERIA 02
GALLERY LINEA FERROVIARIA FRONTIERĂ CURTICI SIMERIA 03
GALLERY LINEA FERROVIARIA FRONTIERĂ CURTICI SIMERIA 04
GALLERY LINEA FERROVIARIA FRONTIERĂ CURTICI SIMERIA 05
 BACKGROUND 7

THE WORK AND THE TECHNIQUE

Construction period: 2017 - on going
780,000

M3 CONCRETE

139,000

T STEEL

11,630,000

M3 EARTH MOVEMENTS

20

STATIONS

0.6

KM OF TUNNELS

51

BRIDGES

- 8,900

T OF CO2 PER YEAR

980,300

PASSENGERS PER YEAR

CLIENT

CFR – Romanian State Railways Company

CONTRACTOR

Webuild with FCC Construction

Discover other works

HERO LINEA FERROVIARIA TRANSCAMERUNENSE ZOOM
THE TRANS-CAMEROON RAILWAY, CAMEROON
HERO LINEA FERROVIARIA DEL SEMPIONE ZOOM
THE SIMPLON RAILWAY LINE, ITALY AND SWITZERLAND
HERO Brennero ZOOM
BRENNER BASE TUNNEL, AUSTRIA AND ITALY
HERO RomaFirenze ZOOM
"DIRETTISSIMA" ROME-FLORENCE HIGH-SPEED RAILWAY LINE, ITALY
HERO AVAC MITO ZOOM
TURIN-MILAN HIGH-SPEED / HIGH-CAPACITY RAILWAY, ITALY
NA Afragola 3840x1600
NAPLES AFRAGOLA HIGH-SPEED RAILWAY STATION, ITALY
HERO TRANSIRANIANA ZOOM
TRANS-IRANIAN RAILWAY, IRAN
HERO AVAC BOFI ZOOM
BOLOGNA-FLORENCE HIGH-SPEED / HIGH-CAPACITY RAILWAY, ITALY
NA BA 3840x1600
NAPLES-BARI HIGH-SPEED / HIGH-CAPACITY RAILWAY LINE, ITALY