You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

Linea Ferroviaria Caransebes -Timisoara - Arad, Lotto 3, Romania

LINEA FERROVIARIA CARANSEBES   TIMIŞOARA   ARAD, LOTTO 3 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

CARANSEBES-TIMIŞOARA-ARAD RAILWAY LINE, LOT 3, ROMANIA

Doubling of the tracks, 3 railway stations, 5 bridges, and 4 road overpasses. These are the works characterizing Lot 3 of the modernization project for the Caransebes-Timişoara-Arad railway line in western Romania.

The objective of the project is to enhance the connections between the capital Bucharest and the western part of the country, as well as the rest of the European continent. The construction sites are part of the broader "Operational Programme for Large Infrastructure (POIM)," and once completed, they will increase the transit speed and railway traffic capacity between Bucharest and Timişoara.

Commissioned by Compania Naţională de Căi Ferate CFR SA, on behalf of the Romanian Ministry of Transport and Infrastructure, the contract includes the design and execution of works for about 14 km of railway line, without interrupting the service on the existing route. On the new line, passenger trains will travel at a speed of 160 km/h, while freight trains will reach 120 km/h.

The project is part of the Rhine-Danube Corridor of the TEN-T, the trans-European transport network, an initiative of the European Union to promote and enhance sustainable mobility for goods and people within the EU, favoring rail transport over road transport. The realization of the entire project will involve 600 direct and indirect workers.

LINEA FERROVIARIA CARANSEBES   TIMIŞOARA   ARAD, LOTTO 3 GALLERY 01
LINEA FERROVIARIA CARANSEBES   TIMIŞOARA   ARAD, LOTTO 3 GALLERY 02
LINEA FERROVIARIA CARANSEBES   TIMIŞOARA   ARAD, LOTTO 3 GALLERY 03
 BACKGROUND 7

THE WORK AND THE TECHNIQUE

Construction period: 2022- on going
14

KM LENGTH OF ROUTE

3

NUMBER OF STATIONS

5

NUMBER OF BRIDGES

4

NUMBER OF ROAD OVERPASSES

CLIENT

Compania Naţională de Căi Ferate CFR SA

CONSTRUCTOR

Webuild Group (72,1%) with Salcef (27,9%)

 

Discover other works

HERO LINEA FERROVIARIA TRANSCAMERUNENSE ZOOM
THE TRANS-CAMEROON RAILWAY, CAMEROON
HERO LINEA FERROVIARIA DEL SEMPIONE ZOOM
THE SIMPLON RAILWAY LINE, ITALY AND SWITZERLAND
HERO Brennero ZOOM
BRENNER BASE TUNNEL, AUSTRIA AND ITALY
HERO RomaFirenze ZOOM
"DIRETTISSIMA" ROME-FLORENCE HIGH-SPEED RAILWAY LINE, ITALY
HERO AVAC MITO ZOOM
TURIN-MILAN HIGH-SPEED / HIGH-CAPACITY RAILWAY, ITALY
NA Afragola 3840x1600
NAPLES AFRAGOLA HIGH-SPEED RAILWAY STATION, ITALY
HERO TRANSIRANIANA ZOOM
TRANS-IRANIAN RAILWAY, IRAN
HERO AVAC BOFI ZOOM
BOLOGNA-FLORENCE HIGH-SPEED / HIGH-CAPACITY RAILWAY, ITALY
NA BA 3840x1600
NAPLES-BARI HIGH-SPEED / HIGH-CAPACITY RAILWAY LINE, ITALY