You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

Genoa Metro: Principe - San Giorgio Caricamento - Le Grazie Section, Italy

METROPOLITANA DI GENOVA TRATTA PRINCIPE   SAN GIORGIO CARICAMENTO   LE GRAZIE 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

GENOA METRO: PRINCIPE - SAN GIORGIO CARICAMENTO - LE GRAZIE SECTION, ITALY

Genoa's metro is a key infrastructure of urban public transport, built in more than one phase with advanced technologies. In the first phase, the stations were built the Principe, Darsena and Caricamento underground stations, which vary in depth from 14 m to 17.50 m. In the second phase, the Sarzano and De Ferrari underground stations, through the widening and improvement of existing tunnels. The 1st functional lot of the De Ferrari - Brignole functional section is part of the third work phase.

The first phase included building line works and building the access shaft of Principe, Darsena and San Giorgio Caricamento. Due to high-pressure water during excavations, a EPB TMB (earth counter-pressure) was used for the first time in Italy, with a 6.30 metre and cutting head with tools for mixed loose/compact soil.  By using this type of TBM model, which was lowered down in the Principe shaft, it was possible to excavate two single-track parallel tunnels, for an overall length of 1,800 m to reach the Le Grazie shaft. The latter allowed, once the excavation of the tunnel on the sea's side was completed, rotating the TBM by 180 degrees, to then excavate the tunnel on the mountain side, so as to reach the shaft of the Principe station, from where the whole machinery was then subsequently removed.

During the first phase of the works, soil consolidation operations were also done to increase the building's stability and that of the close-by ring road. 

The second work phase concerned Sarzano and De Ferrari stations and improving 500 m of the existing line. The third phase of the project included works related to the train inversion system on the Bisagno river, the new Brignole station, and the new railway syste, that includes service shafts between the De Ferrari and Brignole stations, for an overall length of 1,250 m.

METROPOLITANA DI GENOVA TRATTA PRINCIPE   SAN GIORGIO CARICAMENTO   LE GRAZIE GALLERY 01
METROPOLITANA DI GENOVA TRATTA PRINCIPE   SAN GIORGIO CARICAMENTO   LE GRAZIE GALLERY 02
METROPOLITANA DI GENOVA TRATTA PRINCIPE   SAN GIORGIO CARICAMENTO   LE GRAZIE GALLERY 03
METROPOLITANA DI GENOVA TRATTA PRINCIPE   SAN GIORGIO CARICAMENTO   LE GRAZIE GALLERY 04
METROPOLITANA DI GENOVA TRATTA PRINCIPE   SAN GIORGIO CARICAMENTO   LE GRAZIE GALLERY 05
 BACKGROUND 4

THE WORK AND THE TECHNIQUE

Construction period: 1998 - 2012
81,000

M3 TUNNEL EXCAVATION

15,500

M³ CONCRETE LINING OF TUNNELS

4,800

M² RETAINING WALLS FOR STATIONS

 

105,000

M³ EXCAVATION FOR STATIONS

40,000

M³ CONCRETE LINING FOR STATIONS

4,850

T REINFORCEMENT STEEL

CLIENT

Municipality of Genoa, through the concessionaire Ansaldo Trasporti S.p.A.

Discover other works

HERO METROPOLITANA DI NAPOLI    LE STAZIONI DELL'ARTE ZOOM 02
NAPLES METRO - ART STATIONS, ITALY
HERO AIRPORT LINE DI PERTH ZOOM
PERTH AIRPORT LINE, AUSTRALIA
HERO METROPOLITANA DI SAN FRANSCISCO, CENTRAL SUBWAY PROJECT ZOOM
SAN FRANCISCO METRO LINE, CENTRAL SUBWAY PROJECT
HERO MetroDoha ZOOM
RED LINE NORTH UNDERGROUND - DOHA METRO SYSTEM, QATAR
Metro M4 3840x1600
MILAN'S M4 METRO LINE, ITALY
Metro C 3840x1600
ROME METRO - LINE C, ITALY
HERO SYDNEY NORTHWEST ZOOM
SYDNEY METRO NORTHWEST, AUSTRALIA
Metro Salonicco 3840x1600
THESSALONIKI METRO SYSTEM, GREECE
HERO Riyadh ZOOM
RIYADH METRO - ORANGE LINE (LINE 3), SAUDI ARABIA
Metro NY 3840x1600
NEW YORK SUBWAY - LINE F, USA
HERO ParisExpress ZOOM
LINE 16 OF GRAND PARIS EXPRESS, FRANCE
HERO Cityringen ZOOM
THE CITYRINGEN METRO, DENMARK