You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

Mont Blanc - Aosta A5 Motorway, Courmayeur - Morgex Section - Lot 2, Italy

A5 MONTE BIANCO   AOSTA, TRATTA COURMAYEUR  MORGEX   LOTTO 2 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

MONT BLANC - AOSTA A5 MOTORWAY, COURMAYEUR - MORGEX SECTION – LOT 2, ITALY

The Monte Bianco - Aosta project involves the construction of the Courmayeur-Morgex section, Lot N°2, part of the A5 highway connecting the Mont Blanc tunnel to the Aosta-Turin highway. This lot covers the stretch from km 0.00 to km 4+155, diverting traffic from the center of Courmayeur. The route includes an open-air section from the Entrèves area to the entrance of the "Dolonne" tunnel, and an underground section up to the Lallà viaduct.

The construction took place in a geologically complex area, requiring consolidation works and the construction of large-diameter structural wells to stabilize the excavations. The open-air section is protected from avalanches with an earth-reinforced dune, a palisade, and an avalanche barrier. Two viaducts span the Dora di Veny, measuring 270 m and 290 m respectively, with a central span of 110 m to minimize piers in the riverbed.

To protect users from avalanches, a bridge-tunnel with an A-frame structure was adopted, and the overall metal structure weighs about 5,785 tons. From the bridge, access is provided to artificial tunnels, extensions of the "Dolonne" tunnel, measuring 129.95 m and 102.80 m. The "Dolonne" tunnel features two bores of 2,847 m and 2,902 m, with six spaced lay-bys to enhance safety. The excavation was carried out using traditional methods, with explosives and mechanical excavation in rock sections.

The "Dolonne" tunnel includes a water drainage system with two D30 cm concrete pipes under the pavement, doubling the drainage capacity and facilitating repairs. This project improves road accessibility, reduces traffic congestion, and enhances road safety.

A5 MONTE BIANCO   AOSTA, TRATTA COURMAYEUR  MORGEX   LOTTO 2 GALLERY 01
A5 MONTE BIANCO   AOSTA, TRATTA COURMAYEUR  MORGEX   LOTTO 2 GALLERY 02
A5 MONTE BIANCO   AOSTA, TRATTA COURMAYEUR  MORGEX   LOTTO 2 GALLERY 03
A5 MONTE BIANCO   AOSTA, TRATTA COURMAYEUR  MORGEX   LOTTO 2 GALLERY 04
A5 MONTE BIANCO   AOSTA, TRATTA COURMAYEUR  MORGEX   LOTTO 2 GALLERY 05
 BACKGROUND 4

THE WORK AND THE TECHNIQUE

Construction period: 1999 - 2007
663,262

M³ EXCAVATIONS

173,930

M³ CONCRETE

4,033

TON STEEL REINFORCEMENTS

200,013

M RODS

30,584

M JET GROUTING

CLIENT

R.A.V. - Raccordo Autostradale Valle d'Aosta S.p.A.

Discover other works

HERO TRAFORO AUTOSTRADALE DEL FRÉJUS THUMB
THE FRÉJUS HIGHWAY TUNNEL, ITALY AND FRANCE
HERO DUBAI RAS AL KHOR ZOOM
DUBAI RAS AL KHOR CROSSING, UNITED ARAB EMIRATES
Anchieta 3840x1600
ANCHIETA - IMIGRANTES MOTORWAY SYSTEM, BRAZIL
HERO Panama ZOOM
NEW PANAMA CANAL
I 10 3840x1600
I-10 CORRIDOR EXPRESS LANES, USA
HERO AutoSole ZOOM
A1 MOTORWAY, ITALY