Dam on the Mapè River, Cameroon

DIGA SUL FIUME MAPÈ 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

DAM ON THE MAPÈ RIVER, CAMEROON

The project is located 76 km from the town of Foumban, on the Mapé river and was created with the aim of creating a reservoir of 3.2 billion cubic meters to increase, in the dry season, the regularized flows of the Sanaga river bringing them to 850 m3/s, so as to optimize the exploitation of the Edea and Song Loulou power plants.

The main earthen dam has a maximum height of 35 m, 1,521 m long and 5.5 m wide at the crest. Drainage wells, intended to control infiltration into the alluvial soils on which the dam rests, were built every 20 m at the foundations. The volume of the dam embankment is 3.5 million m3.

The G1 and G2 dams on the left bank and of modest height (6 m the first and 5.40 m the second) form a secondary dam with a total length of 992 m which connects with the left wall of the spillway. The D3 dam, 634 m. in length, it instead bars two consecutive depressions along the perimeter of the reservoir; the maximum height of the embankment is 7 m. The spillway is located on the left bank at 700 m from Mapé's bed. The work measures approximately 40 m high, 52.50 m long and 25.50 m in width.

A very rapid mobilization made it possible to achieve the objectives set by the client SONEL and to begin the filling phase of the reservoir in July 1987, the waters of which were used in the dry period of 1988, characterized by a particular drought.

The works were completed in December 1987, nine months ahead of the contractual schedule.

DIGA SUL FIUME MAPÈ GALLERY 01
DIGA SUL FIUME MAPÈ GALLERY 02
DIGA SUL FIUME MAPÈ GALLERY 03
DIGA SUL FIUME MAPÈ GALLERY 04
DIGA SUL FIUME MAPÈ GALLERY 05
 BACKGROUND 7

THE WORK AND THE TECHNIQUE

Construction period: 1985 - 1987
3,780,000

M³ OF VOLUME DETECTED

25,000

M³ CONCRETE VOLUME

320,00011

M³ ROCK EXCAVATIONS

2,020,000

M³ EARTH EXCAVATIONS

 

CLIENT

SONEL – National Electricity Company of Cameroon

Discover other works

HERO DIGA DI XIAOLANGDI ZOOM
XIAOLANGDI DAM, CHINA
HERO PROGETTO IDROELETTRICO DI ROGUN ZOOM
ROGUN HYDROPOWER PROJECT, TAJIKISTAN
HERO DIGA DI RIDRACOLI ZOOM
RIDRACOLI DAM, ITALY
HERO DIGA DI GARAFIRI ZOOM
GARAFIRI DAM, GUINEA
HERO DIGA DI AGARO ZOOM
THE AGARO DAM, ITALY
HERO DIGA DI LEGADADI ZOOM
GIBE HYDROELECTRIC PROJECTS (I - II - III), ETHIOPIA
HERO DIGA DI LEGADADI ZOOM
LEGADADI DAM, ETHIOPIA
UluJelai 3840x1600
ULU JELAI HYDROELECTRIC PROJECT, MALAYSIA
HERO Tarbela ZOOM
TARBELA HYDROELECTRIC PLANT, PAKISTAN
DigaKariba 3840x1600
KARIBA HYDROELECTRIC PLANT, ZIMBABWE
Karahnjukar 3840x1600
KÁRAHNJÚKAR HYDROELECTRIC PLANT, ICELAND
Yacireta 3840x1600
YACIRETÁ HYDROELECTRIC PROJECT, ARGENTINA
Sogamoso 3840x1600
SOGAMOSO HYDROELECTRIC PROJECT, COLOMBIA
HERO Gerd ZOOM
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT (GERD), ETHIOPIA
HERO ValDiLei ZOOM
VAL DI LEI DAM, ITALY
HERO Morasco ZOOM
MORASCO DAM, ITALY