Third lane of the A4 between Quarto d'Altino and San Donà di Piave (VE), Italy

TERZA CORSIA DELLA A4 TRA QUARTO D'ALTINO E SAN DONÀ DI PIAVE (VE) 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

THIRD LANE OF THE A4 BETWEEN QUARTO D’ALTINO AND SAN DONÀ DI PIAVE (VE), ITALY

The summer exodus to the seaside resorts of the northeast has become less congested thanks to the expansion of the A4 Highway with the addition of a third lane between Quarto d'Altino and San Donà di Piave. This is just one of the benefits brought by this project, which in the 18.5 km section not only added the third lane but also rebuilt 9 overpasses, 4 underpasses, 4 bridges, and 2 viaducts.

Upon completion of the work, the immediate benefits included smoother traffic flow towards the main seaside resorts of the northeast and the heavy traffic passing through to Austria and Slovenia, a much higher level of safety, significantly improved comfort for travelers, and, of course, reduced travel times.

This project was characterized by a significant presence of innovative technologies for environmental protection and safety. These include photocatalytic coatings to reduce exhaust gases in the underpasses, noise barriers along the highway axis, and ensuring road user safety.

Finally, the work was carried out without interrupting traffic along the A4, except for some nighttime closures.

TERZA CORSIA DELLA A4 TRA QUARTO D'ALTINO E SAN DONÀ DI PIAVE (VE) GALLERY 01
TERZA CORSIA DELLA A4 TRA QUARTO D'ALTINO E SAN DONÀ DI PIAVE (VE) GALLERY 02
TERZA CORSIA DELLA A4 TRA QUARTO D'ALTINO E SAN DONÀ DI PIAVE (VE) GALLERY 03
TERZA CORSIA DELLA A4 TRA QUARTO D'ALTINO E SAN DONÀ DI PIAVE (VE) GALLERY 04
TERZA CORSIA DELLA A4 TRA QUARTO D'ALTINO E SAN DONÀ DI PIAVE (VE) GALLERY 05
 BACKGROUND 7

THE WORK AND THE TECHNIQUE

Construction period: 2011 - 2016
18,550

KM TOTAL LENGTH OF THE SECTION

1,410

KM LENGTH OF THE VIADUCT

9

OVERPASSES

4

BRIDGES

CLIENT

Deputy Commissioner for Emergency in the traffic and transport sector on the A4 motorway in the section Quarto d'Altino-Trieste and on the motorway link Villesse-Gorizia

Discover other works

HERO TRAFORO AUTOSTRADALE DEL FRÉJUS THUMB
THE FRÉJUS HIGHWAY TUNNEL, ITALY AND FRANCE
HERO DUBAI RAS AL KHOR ZOOM
DUBAI RAS AL KHOR CROSSING, UNITED ARAB EMIRATES
Anchieta 3840x1600
ANCHIETA - IMIGRANTES MOTORWAY SYSTEM, BRAZIL
HERO Panama ZOOM
NEW PANAMA CANAL
I 10 3840x1600
I-10 CORRIDOR EXPRESS LANES, USA
HERO AutoSole ZOOM
A1 MOTORWAY, ITALY