You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

Sibiu-Pitesti Highway lot 5, Romania

AUTOSTRADA SIBIU PITESTI   LOTTO 5 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

SIBIU - PITESTI HIGHWAY LOT 5, ROMANIA

Currently, traffic on the Romanian national road DN7 between Sibiu and Pitești is often congested, with average travel times of only 61.5 km/h, which can extend to an entire day in the event of accidents or roadworks.

This is why the construction of more than 30 km of the Sibiu-Pitesti motorway is a project of fundamental importance for Romania. In fact, it is one of the motorway sections connecting the central and western region of Romania with the European motorway network, forming part of the Rhine-Danube Corridor of the Trans-European Transport Network.

The new motorway, as official European Commission sources state, will not only significantly reduce travel time and transport costs, but will also increase road safety, reducing accidents by 18% by 2040.

More specifically, the 30 km of the Sibiu-Pitești motorway includes Lot 5, from the 92+600 km to the 122+950 km. The project also includes several engineering works such as bridges, viaducts, and interchanges, as well as environmental protection measures. Once completed, the entire motorway will be over 122 km long, significantly improving connectivity and reducing traffic on existing national roads.

AUTOSTRADA SIBIU PITESTI   LOTTO 5 GALLERY 01
AUTOSTRADA SIBIU PITESTI   LOTTO 5 GALLERY 02
AUTOSTRADA SIBIU PITESTI   LOTTO 5 GALLERY 03
AUTOSTRADA SIBIU PITESTI   LOTTO 5 GALLERY 04
AUTOSTRADA SIBIU PITESTI   LOTTO 5 GALLERY 05
 BACKGROUND 7

THE WORK AND THE TECHNIQUE

Construction period: 2021 - on going
450,000

M3 CONCRETE

49,320

TONS OF STEEL

4,500,000

M3 ROCKFILL

90,000

M3 OF EXCAVATION

CLIENT

CNAIR - owned by the Romanian Ministry of Transport and Infrastructure

Discover other works

HERO TRAFORO AUTOSTRADALE DEL FRÉJUS THUMB
THE FRÉJUS HIGHWAY TUNNEL, ITALY AND FRANCE
HERO DUBAI RAS AL KHOR ZOOM
DUBAI RAS AL KHOR CROSSING, UNITED ARAB EMIRATES
Anchieta 3840x1600
ANCHIETA - IMIGRANTES MOTORWAY SYSTEM, BRAZIL
HERO Panama ZOOM
NEW PANAMA CANAL
I 10 3840x1600
I-10 CORRIDOR EXPRESS LANES, USA
HERO AutoSole ZOOM
A1 MOTORWAY, ITALY