Sibiu - Pitesti Highway, Lot 3, Romania

AUTOSTRADA SIBIU – PITESTI, LOTTO 3 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

SIBIU – PITESTI HIGHWAY, LOT 3, ROMANIA

The Sibiu- Pitești highway in Romania is a major road artery under construction that will cross the Carpathians, connecting the central and western part of the country to the European motorway network as part of the Rhine-Danube Corridor of the Trans-European Transport Network (TEN-T) . Once completed, the highway will be more than 122 kilometers long , significantly improving connectivity and boosting economic development in the region.

Lot 3 of the highway is the most complex part of the project, as it will cross the Carpathian Mountains between Cornetu and Tigveni for 37.4 kilometers. Of these, 12.5 kilometers will include bridges and viaducts, while a twin tunnel will be 1.7 kilometers long. In addition to the tunnel, bridges and viaducts, Lot 3 involves the design and construction of over 23 kilometers of dual-lane motorway, two interchanges at Valeni and Cornetu , 18 kilometers of consolidation works, the construction of a maintenance center and control, and interventions for the protection of the environment , including animal crossings at the Olt river .
Once the five under-construction sections of the motorway are completed, the Sibiu- Pitești will connect central and western Romania to the European motorway network, significantly improving mobility. The project is financed 85% by European Union funds and 15% by state funds.

AUTOSTRADA SIBIU – PITESTI, LOTTO 3 GALLERY 01
AUTOSTRADA SIBIU – PITESTI, LOTTO 3 GALLERY 02
AUTOSTRADA SIBIU – PITESTI, LOTTO 3 GALLERY 03
AUTOSTRADA SIBIU – PITESTI, LOTTO 3 GALLERY 04
AUTOSTRADA SIBIU – PITESTI, LOTTO 3 GALLERY 05
 BACKGROUND 7

THE WORK AND THE TECHNIQUE

Construction period: 2023 - on going
37.4

KM TOTAL LENGTH

 

12.5

KM BRIDGES AND VIADUCTS

CLIENT

CNAIR ( Ministry of Infrastructure - Romania)

CONTRACTOR

Webuild (90%) in consortium with the local company Tancrad (10%)

 

Discover other works

HERO TRAFORO AUTOSTRADALE DEL FRÉJUS THUMB
THE FRÉJUS HIGHWAY TUNNEL, ITALY AND FRANCE
HERO DUBAI RAS AL KHOR ZOOM
DUBAI RAS AL KHOR CROSSING, UNITED ARAB EMIRATES
Anchieta 3840x1600
ANCHIETA - IMIGRANTES MOTORWAY SYSTEM, BRAZIL
HERO Panama ZOOM
NEW PANAMA CANAL
I 10 3840x1600
I-10 CORRIDOR EXPRESS LANES, USA
HERO AutoSole ZOOM
A1 MOTORWAY, ITALY