You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

Florida's Tunpike Widening, Florida

AMPLIAMENTO DELLA FLORIDA TURNPIKE 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

FLORIDA'S TURNPIKE WIDENING, FLORIDA, USA

New ramps, additional lanes, improved stormwater management, and drainage. These are just some of the improvements made by the widening of the Turnpike in Florida, carried out by Lane (Webuild Group). This is one of the most frequented toll roads in the state: traveled by more than 2 million travelers every day, it serves as an important link between Miami and Central Florida.

With this project, the Turnpike has been expanded from 4 to 8 lanes, with 2 express lanes and 2 general-purpose lanes in each direction, including the construction of new toll gantries. The goal is to reduce traffic congestion by offering motorists the option to use express lanes with variable prices depending on traffic conditions.

The work included the construction of three new ramps at the SR 417 interchange and the replacement of some pre-existing bridges. In parallel, there has been an improvement in road signage and stormwater drainage management. The success of the project is demonstrated by the awards received, including the "Best in Construction 2021 Award" and the "DBE" award for the utilization of Disadvantaged Business Enterprises, both presented by the Florida Transportation Builders' Association (FTBA).

AMPLIAMENTO DELLA FLORIDA TURNPIKE GALLERY 01
AMPLIAMENTO DELLA FLORIDA TURNPIKE GALLERY 02
AMPLIAMENTO DELLA FLORIDA TURNPIKE GALLERY 03
AMPLIAMENTO DELLA FLORIDA TURNPIKE GALLERY 04
AMPLIAMENTO DELLA FLORIDA TURNPIKE GALLERY 05
 BACKGROUND 7

THE WORK AND THE TECHNIQUE

Construction period: 2022 - ongoing

THREE NEW RAMPS AT THE SR 417 INTERCHANGE:

  • 1,882-FOOT-LONG THIRD LEVEL STEEL BOX GIRDER BRIDGE
  • 1,715-FOOT-LONG THIRD LEVEL STEEL BOX GIRDER BRIDGE
CLIENT

Florida's Turnpike Enterprise

CONTRACTOR

Lane Construction (Webuild Group)

Discover other works

HERO TRAFORO AUTOSTRADALE DEL FRÉJUS THUMB
THE FRÉJUS HIGHWAY TUNNEL, ITALY AND FRANCE
HERO DUBAI RAS AL KHOR ZOOM
DUBAI RAS AL KHOR CROSSING, UNITED ARAB EMIRATES
Anchieta 3840x1600
ANCHIETA - IMIGRANTES MOTORWAY SYSTEM, BRAZIL
HERO Panama ZOOM
NEW PANAMA CANAL
I 10 3840x1600
I-10 CORRIDOR EXPRESS LANES, USA
HERO AutoSole ZOOM
A1 MOTORWAY, ITALY