You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

Construction Project to Link State Road SS 36 with Milan's Motorway Network

LAVORI DI CONNESSIONE TRA LA S.S. 36 E IL SISTEMA AUTOSTRADALE DI MILANO 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

CONSTRUCTION PROJECT TO LINK STATE ROAD SS 36 WITH MILAN'S MOTORWAY NETWORK

The project to strengthen and redevelop the SP 5 provincial road in Monza represents an important intervention to improve accessibility and road safety in the area. An integral part of the itinerary of the new S.S. 36 of Lake Como and Spluga, the project saw the creation of a new primary motorway infrastructure, separated from local traffic through the implementation of dedicated carriageways and strategic junctions with the Northern Ring Road and the the A4 Turin-Venice motorway.

The heart of the project was the construction of a tunnel 1,805 meters long in each direction, designed to clearly separate urban traffic from the main motorway flow. The tunnel has been equipped with cutting-edge technologies to guarantee safety and air quality, with an advanced filtering system that reduces fine particles (PM10) emitted by up to 96%.

The project also represented an opportunity to improve the urban environment of Monza: the burial of the SS 36 freed up considerable surface space, which was transformed into a vast city park with new green areas, fast and slow cycle paths , integrating the previously divided urban fabric. The modernization of infrastructure, such as the new large-diameter sewer networks, has further contributed to improving the quality of life and environmental sustainability of the city, offering new benefits to the residents of Monza.

LAVORI DI CONNESSIONE TRA LA S.S. 36 E IL SISTEMA AUTOSTRADALE DI MILANO GALLERY 01
LAVORI DI CONNESSIONE TRA LA S.S. 36 E IL SISTEMA AUTOSTRADALE DI MILANO GALLERY 02
LAVORI DI CONNESSIONE TRA LA S.S. 36 E IL SISTEMA AUTOSTRADALE DI MILANO GALLERY 03
LAVORI DI CONNESSIONE TRA LA S.S. 36 E IL SISTEMA AUTOSTRADALE DI MILANO GALLERY 04
LAVORI DI CONNESSIONE TRA LA S.S. 36 E IL SISTEMA AUTOSTRADALE DI MILANO GALLERY 05
 BACKGROUND 7

THE WORK AND THE TECHNIQUE

Construction period: 2008 - 2014
4,300

M DEVELOPMENT OF THE MAIN ROAD OF THE S.S. 36

 

 

6,850

M DEVELOPMENT OF SECONDARY ROADS

900

M DEVELOPMENT OF THE CONNECTION EXCHANGE BETWEEN THE S.S. 36 AND THE A4

1,805

M DEVELOPMENT OF THE MONZA TUNNEL

780

M DEVELOPMENT OF THE TRANSVERSAL CONNECTION UNDERPASSES

16,580

M OVERALL DEVELOPMENT OF THE ROAD SYSTEM

1,080,000

M3 EXCAVATIONS

CLIENT

ANAS S.p.A.

Discover other works

HERO TRAFORO AUTOSTRADALE DEL FRÉJUS THUMB
THE FRÉJUS HIGHWAY TUNNEL, ITALY AND FRANCE
HERO DUBAI RAS AL KHOR ZOOM
DUBAI RAS AL KHOR CROSSING, UNITED ARAB EMIRATES
Anchieta 3840x1600
ANCHIETA - IMIGRANTES MOTORWAY SYSTEM, BRAZIL
HERO Panama ZOOM
NEW PANAMA CANAL
I 10 3840x1600
I-10 CORRIDOR EXPRESS LANES, USA
HERO AutoSole ZOOM
A1 MOTORWAY, ITALY