SAN LORENZO HYDROELECTRIC PLANT, EL SALVADOR
Located in the lower part of the Lempa River, 50 kilometers from its mouth, in the provinces of Usulután and San Vicente, the dam of the San Lorenzo hydroelectric power plant extends for 650 meterst, forming a reservoir of 35,000,000 cubic meters.
The plant also includes a concrete spillway with openings operated by radial gates and a power station that operates with 2 Kaplan turbines capable of utilizing the 32-meter drop to generate energy. The power station had an initial installed capacity of 180 MW, later increased to 635,500 kW, which is sufficient to cover the current energy demand.
During the construction, which lasted from 1978 to 1984, a village for employees was built on the right bank of the river with houses, a workshop, storage areas, and a substation with power lines.

THE WORK AND THE TECHNIQUE
M3 EXCAVATIONS
M3 DAMMED EMBANKMENT
M3 OTHER EMBANKMENTS
M3 CONCRETE
Comisión Ejecutiva Hidroeléctrica del Rio Lempa
CSC Costruzioni (Webuild Group)