You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

Nathpa Jhakri Hydroelectric Project, india

PROGETTO IDROELETTRICO DI NATHPA JHAKRI 3840x1600
You are exploring Collection:
Discover the other Museum Collections
Edutainment
Edutainment
"It can’t be done"
"It can’t be done"
Photos
Photos
Cinema
Cinema
Next
Previous

NATHPA JHAKRI HYDROELECTRIC PROJECT, INDIA

The Nathpa Jhakri Hydroelectric Project, located in the state of Himachal Pradesh in India, is one of the largest hydroelectric power plants in the country. The project was built to harness the hydroelectric potential of the Satluj River. The dam is located near Nathpa and the power station at Jhakri, from which the project derives its name. The construction involved significant engineering challenges, including the creation of an arch-gravity dam and six Francis turbines of 250 MW each, resulting in a total installed capacity of 1500 MW.

During construction, advanced techniques and technologies were employed. The project required careful planning to minimize environmental impact and ensure the safety of local populations.

The Nathpa Jhakri Hydroelectric Project plays a crucial role in providing electricity to northern India, significantly contributing to the stability of the region's power grid. The plant generates renewable energy, reducing dependence on fossil fuels and helping to mitigate greenhouse gas emissions. Additionally, the infrastructure has created local job opportunities and promoted economic development in the region.

In summary, the Nathpa Jhakri Hydroelectric Project represents a significant engineering and environmental success, highlighting India's capability to develop sustainable and modern energy infrastructure.

PROGETTO IDROELETTRICO DI NATHPA JHAKRI GALLERY 01
PROGETTO IDROELETTRICO DI NATHPA JHAKRI GALLERY 02
PROGETTO IDROELETTRICO DI NATHPA JHAKRI GALLERY 03
PROGETTO IDROELETTRICO DI NATHPA JHAKRI GALLERY 04
PROGETTO IDROELETTRICO DI NATHPA JHAKRI GALLERY 05
 BACKGROUND 7

THE WORK AND THE TECHNIQUE

Construction period: 1993 - 2002
1,300.000

M3 UNDERGROUND EXCAVATION

318,000

M3 UNDERGROUND CONCRETE

10,000

T SHORING

4,000

T CENTERING

12,000

T REINFORCING IRON

296

M SURGE TANK DEPTH

24,5-10

M VARIABLE EXCAVATION DIAMETER

CLIENT

Nathpa Jhakri Power Corporation Ltd. (NJPC)

Discover other works

HERO DIGA DI XIAOLANGDI ZOOM
XIAOLANGDI DAM, CHINA
HERO PROGETTO IDROELETTRICO DI ROGUN ZOOM
ROGUN HYDROPOWER PROJECT, TAJIKISTAN
HERO DIGA DI RIDRACOLI ZOOM
RIDRACOLI DAM, ITALY
HERO DIGA DI GARAFIRI ZOOM
GARAFIRI DAM, GUINEA
HERO DIGA DI AGARO ZOOM
THE AGARO DAM, ITALY
HERO DIGA DI LEGADADI ZOOM
GIBE HYDROELECTRIC PROJECTS (I - II - III), ETHIOPIA
HERO DIGA DI LEGADADI ZOOM
LEGADADI DAM, ETHIOPIA
UluJelai 3840x1600
ULU JELAI HYDROELECTRIC PROJECT, MALAYSIA
HERO Tarbela ZOOM
TARBELA HYDROELECTRIC PLANT, PAKISTAN
DigaKariba 3840x1600
KARIBA HYDROELECTRIC PLANT, ZIMBABWE
Karahnjukar 3840x1600
KÁRAHNJÚKAR HYDROELECTRIC PLANT, ICELAND
Yacireta 3840x1600
YACIRETÁ HYDROELECTRIC PROJECT, ARGENTINA
Sogamoso 3840x1600
SOGAMOSO HYDROELECTRIC PROJECT, COLOMBIA
HERO Gerd ZOOM
GRAND ETHIOPIAN RENAISSANCE DAM PROJECT (GERD), ETHIOPIA
HERO ValDiLei ZOOM
VAL DI LEI DAM, ITALY
HERO Morasco ZOOM
MORASCO DAM, ITALY